The main stages of the installation of the entrance door

In the range of building stores there are various types of entrance doors made of wood, fiberglass, aluminum or steel. Such doors may differ in strength, weight and appearance, but when installed, specialists adhere to the same guidelines.

Основные этапы установки входной двери

The main stages of the installation of the entrance door

In the range of building stores there are various types of entrance doors made of wood, fiberglass, aluminum or steel. Such doors may differ in strength, weight and appearance, but when installed, specialists adhere to the same guidelines.

How to install different door models in the house?

It is quite easy to mount doors of good quality in the case that there are locksmith tools at hand, and you also have experience with them. To successfully install the door structure in the arsenal should be the following tools:

  • drill and associated drills;
  • roulette, building level;
  • hacksaw;
  • screwdriver;
  • self-tapping screws and screws;
  • foam.

 

Following the recommendations, you can install the doors from the manufacturer in a fairly short time.

Preparing the doorway

There are several stages in the installation of the door structure and the very first step is the preparation of the doorway. It consists in dismantling old structures - removing the cladding, the box and the door itself. Then it is worth starting to assemble a new box, but it is important to take into account that its dimensions are perfectly matched to the door leaf, and the parts are securely fastened together. Since in the future it will be necessary to seal joints and seams using mounting foam, it is worth considering an additional gap of one to two centimeters between the doorway and the box.

Embedding of loops and a test canopy of the door leaf

After the box is assembled and installed in the doorway on the level, it is worthwhile to proceed to the installation of the hinges. To do this, you need to map out the location of their tie-in, and then secure them with the help of self-tapping screws. Next, hang the door leaf and try to open and close the door. If there are no problems, then the doors of Ukraine were assembled correctly, and you can proceed to the final stage of the work.

 

At the final stage, the box is fixed with screws and the joints are filled with mounting foam. After the treatment of the joints it is recommended not to use the door within 24 hours, and after full drying of the foam proceeds to install the clypeus.

Do not know which door to choose?

Get a free consultation

Our specialist will answer all your questions, and also help you find the door to your budget and needs.

Request for consultation


Order